Five risk channels

Where CGT value is lost, and what closes the gap.

Each channel carries a distinct failure mode and a defined evidence response. Pain signals are drawn from reviewed cases; outcomes are the artifacts delivered.

01Transaction

Deal Risk

Pain signal

CMC deficiencies are the leading documented cause of terminated licensing, M&A, and partnership decisions in CGT.

Outcome

Red-flag register and evidence-chain map delivered before the term sheet; remediation cost stated as a range.

02Legal

IP & Legal Defense

Pain signal

Litigation exposure is argued without a technical evidence map, leaving process and comparability claims undefended.

Outcome

Litigation risk map and expert technical support tied to specific manufacturing and analytical claims.

03Regulatory

Global Compliance

Pain signal

FDA, EMA, and NMPA inspections surface the same manufacturing gaps that were visible internally but unresolved.

Outcome

Inspection-readiness assessment against agency-specific expectations, with prioritized closure items.

04Quality

Audit & Quality

Pain signal

CAPA history, deviation records, and batch documentation fail to reconstruct a defensible control narrative.

Outcome

Data-integrity and CAPA pre-check with a traceability index across deviation, batch, and release records.

05Manufacturing

Scale-up

Pain signal

Critical parameters shift between sites and scales; comparability packages lack the sensitivity to detect meaningful change.

Outcome

Scale-risk and comparability matrix linking CPPs to transfer protocols, boundaries, and continued process verification.

Initiate an Assessment

Map your exposure across these five channels to a prioritized evidence plan before the next milestone.